Careers    Contact

Search
Close this search box.
Search
Close this search box.

Facebook    LinkedIn    YouTube     

Overcoming Product Inventory Challenges with an All-Inclusive ERP Solution

The Customer Cush Suspensions specializes in OEM and aftermarket suspensions for trucks and trailers to help drivers achieve optimized ride quality. They are a provider of both engineered-to-order suspensions and standard suspensions for trucks and trailers. Cush Suspensions needed an all-inclusive solution to meet the tracking requirements of production, work order management, and inventory control. […]

Inventor Phase: 3D Model Automation

The Customer’s Challenge WJ Higgins had a long-standing customer who expressed a need for a quicker and more innovative methodology for the design and manufacturing of their construction components. As a result of their customer’s necessity, WJ Higgins began to examine what of their current design and manufacturing procedures might be changed or upgraded in […]

Digital Transformation with Autodesk PLM

The Customer’s Challenge ME Global, a wholly owned subsidiary of ME Elecmetal, manufactures high-quality components for large-scale mining operations. As a global company, it realized that a comprehensive digital transformation could help it improve quality, product development ingenuity, and cost-efficiency. When your products can crush rocks the size of cars, thinking big comes naturally. This […]

Updating Autodesk Fusion Lifecycle API-Integrations to use Forge-based Authentication

The Customer’s Challenge Greenpoint Technologies (A Safran Company) faced a tight deadline to update Autodesk Fusion Lifecycle API based integrations to use Forge-based authentication. The Project Goals Greenpoint Technologies relies on extensive integration between Autodesk Fusion Lifecycle, Autodesk Vault, and various business systems to automate key Engineering processes. Greenpoint had a goal to beat the […]