A Seamless Transition to Efficiency
The issue faced by Spire Collective was that the current PLM system was outdated and did not allow for proper process control between different departments within the company. A system was needed that could be adapted to the existing workflow, rather than having the system dictate operational methods.
Connecting Engineering Design Data and Documentation
Lemke Industrial Machine had historically used Microsoft One Drive and SharePoint to manage all their engineering data. Over time, it became clear that they needed more robust procedures and methodologies with which to manage their engineering design data and documentation.
Overcoming Inventory Challenges
We utilized expert solutions, capable platforms, and strong partnerships to solve Cush Suspension’s initial challenges, and set them up for future growth and success. See how we did it. https://youtu.be/Dtf7hofCCag The Customer Cush Suspensions specializes in OEM and aftermarket suspensions for trucks and trailers to help drivers achieve optimized ride quality. They are a provider […]
Updating Product Lifecycle Management Systems
A Client Success Story with Team D3 and Ezurio using Autodesk Fusion Manage and Upchain Customer challenge Ezurio, formerly known as Laird, is a global leader in comprehensive connectivity solutions for the transport, connected industry, connected medical, telecom/computing, and mobile device markets. With their existing worldwide footprint and with the constant advancements in related technologies, […]
Innovative Solutions: How Fusion and Generative Design Reshape Product Innovation
The challenge Britten faced was to redesign a “tried and true” part, that has been sold in the marketplace for years, to secure “intellectual property” for the redesigned part through a registered patent.